09/30/2018 Vertical Stabilizer – Primed (2 Hour)

I had learned my lesson from priming HS last time so I was extremely patient priming the VS. I actually spent two days on this. I first primed one side of every part on Saturday and let them dried off for a full day before priming the other side on Sunday. This worked out pretty well as I didn’t accidentally wipe off the not fully cured primer like I did when priming both sides of every part in the HS. I was also getting better at spraying the primer isotherm rattle can. The primed layer is thinner and more evenly spread than last time.

Overall I’m pretty happy with the priming result this time 😀