07/11/2018 Horizontal Stabilizer – Elevator Hinge Bearing (0.5 Hour)
I revisited the first section of the horizontal stabilizer today and riveted the elevator hinge bearing and brackets together, and match drilled #12 holes where it is attached to the spar. I probably spent more time on prep work, such as getting the rear spar and reinforcement bars clecoed together again as well as adjusting my pneumatic squeezer for my first 6 rivets on the actual plane, than the actual riveting and drilling.