06/30/2018 Horizontal Stabilizer – Clecoed Right Skeleton and Skin (1.5 Hour)
Today I disassembled the left half of the horizontal stabilizer and started on the right half. I put the skeleton together and match drilled the holes to size #30. I also put the right skin onto it.