06/05/2018 Horizontal Stabilizer-Drilled Relief Holes and Bent Front Spar (2 Hours)
I was a little nervous at the beginning of today’s session, because I haven’t practiced drilling relief hole or bending
Read moreI was a little nervous at the beginning of today’s session, because I haven’t practiced drilling relief hole or bending
Read moreThe front spar requires more work than the rear spar, because as Van’s points out in their instructions that the
Read moreToday I primed the hinge bearing VA-146 and a little rough area of the hinge bracket. After spraying primer on
Read moreMatch drilled all elevator brackets and bearings. The center hinge bearing was a little awkward to access once it is
Read more