06/25/2018 Horizontal Stabilizer – Finished Drilling Left Side (1 Hours)
Today I finished match drilling all the remaining holes on HS-601 skin for the left half of the horizontal stabilizer.
Read moreToday I finished match drilling all the remaining holes on HS-601 skin for the left half of the horizontal stabilizer.
Read moreIt has been a long time since the last update! I caught a really bad cold last Sunday that basically
Read moreToday I spent a couple hours on fitting the inner ribs (well I called them “inner” as they will be
Read moreI clecod the skin onto left half of the horizontal stabilizer today. Initially when removing the protective plastic on the
Read moreToday I started the section in the plan that’s called “Drilling the horizontal stabilizer”, which is essentially putting the skins
Read moreI drilled and primed a new elevator bearing today, carefully avoiding primer on the most inner bearings. I still ended
Read moreBasically continue on what I was working on yesterday. Now I’ve prepared HS-706, HS-707 and HS-708 ribs. HS-00005 and HS-00006
Read moreThis is my first time experience in fluting so it took me about an hour to finish the first rib.
Read moreThe aft flange on HS-00006 front rib need to be trimmed according to plan. I marked the line and used